Two stages, one order, no shortcuts
Waterproofing and tiling get talked about together because they happen back to back, but they are not the same trade and they are not the same risk. Tiling that goes wrong looks bad. Waterproofing that goes wrong destroys the floor frame, the wall plates and sometimes the room underneath, and you will not know about it for years.
The order is fixed, and every step depends on the one before it.
Step one: preparation
The old tiles, the mortar bed and the wet-area linings come out. Then the substrate gets assessed honestly:
- Timber floors need structural sheeting fixed down so the floor does not flex under the tiles, and any soft or water-damaged joists and bearers replaced first
- Slabs need cracks assessed, laitance and old adhesive removed, and any moisture issue identified
- Walls need to be plumb and flat enough for the tile size chosen, and lined with a wet-area board
- Penetrations — taps, the shower rose, the waste, the toilet — need to be in their final positions
Flatness is not a cosmetic issue. A large-format tile on a bowed wall ends up with lipping, and a floor that dips holds water on top of a perfectly good membrane.
Step two: falls and screed
The floor is screeded so water runs to the waste rather than sitting in a corner or creeping towards the doorway. In a level-entry shower with a linear drain, this is usually a single plane fall towards the drain, which is easier to build accurately than four falls into a central square waste and far easier to tile with large tiles.
Getting the falls right before waterproofing matters, because a membrane is not a levelling compound. Water that ponds on a membrane is water looking for the weakest detail.
Step three: the membrane
This is where the job is either done or only appears to be done.
Corners and junctions first. Bond breakers or flexible reinforcement at the wall-to-floor junctions, internal corners and around the waste, so the membrane can cope with movement instead of tearing.
Penetrations sealed. Every tap and pipe outlet is a hole through the waterproofing and is detailed individually.
Then the coats. The membrane goes over the shower floor and up the shower walls, over the rest of the floor, across the doorway, and to the heights the standard requires for the room type. Coverage rate and number of coats follow the manufacturer's specification — this is a measured product, not "until it looks blue enough".
Then it is left alone. Cure time is dictated by the product and the conditions. In humid Shoalhaven weather in February, or a cold wet week in July, it takes longer than the fastest figure on the data sheet. The membrane also gets photographed, and the certificate kept.
Step four: set-out
Before adhesive is mixed, the tiler works out where every row lands. Good set-out means:
- Full tiles in the places the eye goes first, and cuts in the corners, behind the door and under the vanity
- The floor grid relating to the walls, so joints line up rather than nearly lining up
- The niche and any feature centred on something deliberate
- Cuts around the waste and the tapware planned, not discovered
- A level datum taken off a laser line, not off a floor that is not level
In a small room this is most of the difference between a tidy bathroom and an awkward one, and it costs nothing but thinking time.
Step five: tiling, grout and silicone
Tiles are fixed with an adhesive suited to the tile, the substrate and the wet area, back-buttered where the format requires it, with a consistent bed so there are no voids under the corners.
Grout. A high-performance or epoxy grout in the shower stands up to cleaning far better than a basic cement grout. Mid-tone colours are the practical choice in a coastal house where sandy feet are a daily event.
Silicone, not grout, in the movement joints. Internal corners, the wall-to-floor junction and around the bath and the base are movement joints. Grout in those places cracks, and cracked grout in a corner is how water gets to a membrane's weakest point.
What coastal conditions change
Cure times stretch. High humidity slows everything, and the Shoalhaven gets plenty of it through summer. Building the extra days into the program rather than pretending they will not happen is what keeps the job honest.
Salt in the air affects fixings. Screen brackets, towel rails and rail fixings near the water at Huskisson, Vincentia, Culburra or Mollymook should be stainless, and they should be fixed into blocking with the penetrations sealed.
Wind-driven rain during the job. In an older house where a window or a wall is opened up, the room needs protecting overnight. A wet substrate does not take a membrane.
Sandy floors are hard on grout. Sand is an abrasive. It works grout lines in an entry-level tile far faster than the same floor would wear in an inland suburb.
What you should end up holding
- Photographs of the prepared substrate, the falls, the reinforced corners and the finished membrane
- The waterproofing certificate or documentation for the work
- Product details for the membrane, adhesive and grout
- Tile details, including the batch, and any spares kept in the garage
That paperwork is worth real money when you sell, and it is the first thing anyone asks for if a problem appears later.
Where this sits in the job
Waterproofing and tiling are stages within a renovation rather than a stand-alone service in most cases, because they cannot be done properly without the strip-out and preparation that comes before them. See full bathroom renovations for the whole sequence, step by step for how long each stage takes, and the cost page for the guide tiers.
Renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request.
Call 02 4404 2684 or send the details through.
Questions people ask before they commit
How long does a membrane need to cure before tiling?
It depends on the product, the number of coats, the temperature and the humidity, and the manufacturer's instructions set the minimum. On the coast in a wet week it takes longer than the label's best-case figure. Tiling over a membrane that is not cured is one of the most common causes of failure.
Who is allowed to waterproof a bathroom in NSW?
Waterproofing is treated as specialist work in NSW and should be carried out by an appropriately licensed contractor, with domestic wet areas covered by the Australian standard. Licensing rules change, so confirm the current requirements with NSW Fair Trading.
Should the waterproofing be photographed?
Yes, every time. Once the tiles are on, nobody can see what was underneath them. Photographs of the corners, the penetrations, the shower walls and the finished membrane, plus any certificate, belong with your house papers.
Can you just re-waterproof without removing the tiles?
Not properly. A membrane has to be applied to a prepared substrate with the corners and penetrations detailed, which means the tiles and the old bed come off. Products applied over existing tiles are a patch, not a wet-area membrane.