Money and quotes
Why will nobody give me a price over the phone?
Because the things that move the price most cannot be seen over a phone: what is under the floor, whether the sheeting is fibro, whether the pipes are galvanised, whether anything has to be carried up a flight of steps, and whether the plumbing has to move on a slab. A measure takes half an hour and produces a figure you can rely on. Anyone who quotes a firm price sight unseen is either guessing or planning to add it back later. See what it costs.
Is a refresh ever enough?
Yes, when the waterproofing and the floor are sound. New tapware, a vanity, a mirror cabinet, better lighting, a regrout and a decent ducted fan can transform a nineties bathroom for a fraction of a full renovation. What a refresh cannot do is fix a failed membrane.
Is it cheaper to do the laundry at the same time?
Per room, usually yes, because the trades, the skip and the set-up happen once. See laundry renovations.
How do I compare two very different quotes?
Line by line, against the same list of questions. Differences in price nearly always come from differences in scope, not from one builder being generous. The cost page has the list to ask.
Older houses
How likely is asbestos in a Shoalhaven house?
Reasonably likely in anything built or renovated before about 1990. Fibro was the standard cheap cladding and wet-area lining across Nowra, Bomaderry, the river villages and the coastal towns for decades, and bathrooms and laundries were two of the commonest places for it. It is not dangerous sitting undisturbed on a wall. It becomes a problem when someone takes an angle grinder to it, which is why a sample goes to a laboratory before demolition starts.
The floor feels spongy beside the shower. Is that serious?
It means water has been getting into the timber underneath, probably for years. It is entirely fixable, but it needs the tiles up and the joists and bearers inspected. Tiling over a soft floor is throwing money away.
Should original galvanised pipes be replaced?
If they are original, yes, while the walls are open. They corrode from the inside, which shows up as rust-coloured water in the morning and pressure that drops away when another tap runs. Replacing them later means opening the walls again.
Our house is in Berry's heritage area. Does that stop us?
Almost never for the inside of a bathroom. Heritage controls are mostly concerned with what is visible and with the fabric of significant buildings, so external windows, doors and street-facing changes are where it bites. Confirm your property's situation with Shoalhaven City Council or a certifier before you plan anything that changes the outside.
Coast and climate
Why does mould keep coming back on the ceiling?
Warm wet air hits a cooler ceiling and condenses. If the exhaust fan is undersized, or vents into the roof cavity rather than outside, the moisture never leaves the building. A correctly sized fan ducted outside on a run-on timer fixes far more mould than any spray from the supermarket.
We are two streets from the beach. Will new tapware corrode?
Cheap tapware will, within a couple of years. Salt-laden air pits chrome plating and attacks screen brackets, fan grilles and rail fixings. Better-grade tapware, stainless hardware and an occasional wipe-down make a genuine difference at Huskisson, Vincentia, Culburra, Callala and Mollymook.
Does sand really matter?
It does. Sand is an abrasive that works away at grout lines and scratches soft floor finishes, and it blocks a small square shower waste far more readily than a linear drain that lifts out in one piece. In a beach house, plan the floor and the drain around it.
We are on bushfire-prone land. Does that affect a bathroom?
Not usually for internal work. It can matter where the job changes an external window or wall and the work needs approval, because bushfire construction requirements may then apply. A certifier or the council will tell you exactly where you stand.
It gets cold out our way in winter.
Behind the coast, around Cambewarra, Kangaroo Valley and the country west of Berry, it genuinely does. A tiled bathroom with no heat source is a room people rush through. Heating gets designed in at rough-in, not added afterwards.
Holiday houses and rentals
Can the work be done between bookings?
Not a full renovation — the membrane cure alone rules that out. What can be managed is the season. Most holiday-house work down here happens between about May and August, away from summer, Easter and long weekends. See rental bathrooms.
What breaks first in a holiday let?
Grout worn by sand, corroded screen hardware, silicone in the corners, and the exhaust fan. Then anything cheap that gets used hard by people who do not own it.
What are my obligations as a landlord?
NSW residential tenancy law sets minimum standards for rented premises and obligations around repairs and access. The details change, so confirm the current position with NSW Fair Trading rather than relying on a website.
Access and ageing at home
What is the one change worth making?
Removing the step into the shower. A level-entry shower with a linear drain removes the main trip and fall risk and makes the room workable with a walker, a stool or someone helping. See accessible bathrooms.
Can grab rails be added to the tiles later?
Not safely. A rail needs fixing into blocking or a proper backing sheet behind the lining. Install the blocking while the walls are open even if you do not want rails yet. It costs almost nothing now and is a wall-opening job later.
Is there funding available?
There are Commonwealth and NSW programs, and scheme or insurance funding in some circumstances, each with its own eligibility and assessment process. Requirements change, so confirm with the relevant body before committing to work.
Units and strata
What do I need from the owners corporation?
Generally approval before waterproofing to common structure is replaced, along with the building's rules on work hours, access and where a skip can go. Get it in writing before ordering anything.
Can we move the shower in a unit?
Sometimes, but it means cutting a slab with somebody's ceiling underneath it, and some buildings will not permit it. Keeping the plumbing where it is nearly always gives a better result for the money.
The practical stuff
How long will we be without the bathroom?
Roughly four to five and a half weeks on site for most main bathrooms. Step by step sets out each stage with day ranges.
Who actually does the work?
Renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request, and the NSW Fair Trading register will show you the holder, class, status and any disciplinary history.
What if something is found once the room is open?
You get told, with photographs, before it is dealt with. The quote should already carry stated allowances for the likely finds and a written variation method, so it is a decision rather than a surprise invoice.
What do we get at the end?
A clean room, a walk-through, a list of anything outstanding, the waterproofing certificate, product and warranty details, and your spare tiles.
Still got a question? Call 02 4404 2684 or send the details through.
Questions people ask before they commit
How much does a bathroom renovation cost around here?
It depends on the room size, whether the plumbing moves, the finishes and what an older house is hiding. The cost page sets out three broad guide tiers for 2026 and the factors that move a job between them, and a free measure produces a written figure for your bathroom.
Do I need council approval?
Usually not for internal work inside the existing walls of a house that is not a heritage item, with nothing structural changing. Heritage listings, the Berry conservation area, changes to external windows or walls, and bushfire-prone land can change that. Shoalhaven City Council or a certifier confirms it.
How is asbestos handled?
Sheeting in a home built or renovated before about 1990 is sampled and laboratory tested before demolition. If it is positive, a licensed asbestos removalist removes it under NSW rules and a clearance is issued before the renovation continues.
What deposit can be asked for?
In NSW, no more than 10 per cent of the contract price for residential building work. Above the threshold for home building compensation cover, that cover must be in place before a deposit is requested.
Do you have reviews?
Not yet. This site is new and there is nothing invented on it. Judge the quote, the questions asked at the measure, and the licence details you can check on the public register yourself.