Full Bathroom Renovations in Nowra and District

When the leak is under the floor, the pipes are original and the tiles were fashionable during the Whitlam years, patching is not saving money.

Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →

When the whole room has to come out

Full renovations get chosen for a handful of honest reasons, not because a bathroom looks dated. Look for two or three of these together:

  • Water is going somewhere it should not. A soft patch of floor beside the shower, swollen skirting, a stain on the ceiling of the room below or on the other side of the wall.
  • Floor tiles are drummy or cracked. Tap them with a coin. A hollow ring means the bed has lost its bond.
  • Original pipework. Galvanised supply lines with rust-coloured water in the morning and pressure that drops when the kitchen tap runs.
  • Mould keeps coming back within a fortnight of scrubbing it, which almost always means the room has no working ventilation.
  • The layout fights whoever uses it — a bath nobody has filled in a decade eating half the floor, or a vanity that blocks the door.
  • There is fibro in the room and you would rather deal with it once, properly, than keep drilling into it.

The order of work

1. Sample and test before anything is disturbed

If the house or the bathroom dates from before about 1990, sheeting is sampled and laboratory tested first. Fibro was everywhere in Nowra, Bomaderry and the coastal villages, in wall linings, eaves and under floor coverings. A positive result means a licensed asbestos removalist takes it out and issues a clearance before the renovation continues. That is not an optional extra and it is not a job for a general builder.

2. Strip-out

Tiles, the old mortar bed, bath, base, vanity, toilet, screen and wall linings all come out. Expect a noisy, dusty few days with protection over floors and the path. When the room is bare, everyone finally knows what the house has been hiding.

3. Fix what the strip-out exposes

Rotten joists and bearers, a termite-damaged bottom plate, a wall out of plumb, rusted lintel over a window. Each one gets photographed, talked through with you, and dealt with against the allowance written into the quote instead of becoming an argument.

4. Rough-in

New supply and waste pipework, new circuits for lighting, the exhaust fan and any heating. Old galvanised pipe gets replaced while the walls are open, because doing it later means opening them again. Anything changing position happens at this stage.

5. Sheeting and screed

Wet-area board to the walls, structural sheeting over timber floors so nothing flexes, and a screed that actually falls to the waste rather than pooling in a corner.

6. Waterproof, then wait

A membrane over the floor, up the shower walls and across every junction, with the corners reinforced. Then it is left alone to cure. Humid coastal weather can stretch that out, and rushing it is the single most common cause of a bathroom leaking two years later. See waterproofing and tiling.

7. Tiling

Set-out is worked out before a single tile is fixed, so awkward cuts land behind the door and not beside the mirror.

8. Fit-off, clean, handover

Vanity, toilet, tapware, screen, mirror, fan, lights and accessories. Plumber and electrician connect and test, the room is cleaned properly, and you get a walk-through plus the waterproofing paperwork.

Design decisions worth making early

Bath or no bath? In a house where the youngest occupant is thirty-five, the bath is usually floor space being wasted. In a family home, or one you will sell to a family, it still earns its keep. Read choosing a bath before you decide either way.

The toilet you pick changes the room. A back-to-wall or in-wall cistern pan buys back real depth in a narrow bathroom. Toilet suites explained covers the trade-offs, including servicing access.

Plan for the next twenty years now. A level-entry shower, solid blocking in the walls for grab rails later and a floor tile with genuine wet grip cost almost nothing while the room is open. Retrofitting them costs plenty. See accessible bathrooms.

Storage. Most Shoalhaven bathrooms built before 1990 have essentially none. Drawers rather than cupboard doors, a mirror cabinet, and a tiled niche in the shower wall.

Light where you need it. A light at the mirror instead of one fitting in the middle of the ceiling casting your own shadow onto your face.

Built for this coast

Ventilation first. A fan sized to the room, ducted out through the wall or eave rather than into the roof cavity, on a run-on timer. In a humid coastal town this matters more than any other single choice.

Tapware and hardware. Within a few streets of the water at Huskisson, Vincentia, Mollymook or Culburra, cheap chrome pits within a couple of years. Better-grade tapware and stainless screen fixings are worth the difference.

Grout and sealing. A high-performance or epoxy grout in the shower, and a mid-tone colour that does not show every mark from sandy feet.

Ceiling. A wet-area lining and a paint made for bathrooms, not the same tin used on the hallway.

Timber floor or slab

Timber floors are common in fibro and weatherboard homes and in older cottages around Berry and Milton. They give you flexibility, because pipes can run underneath, but they move and they need careful membrane detailing at the junctions.

Slabs turn up in most brick veneer built from the seventies on, and in newer estates at Worrigee and South Nowra. They are more forgiving to waterproof, but moving a waste means cutting concrete.

What the quote should spell out

  • Asbestos testing, and how removal would be priced if a sample comes back positive
  • A stated allowance for rot, termite damage or structural repair
  • Which pipes are being replaced and which are staying
  • Fittings by brand and model, not "quality tapware"
  • Tile allowance per square metre, and who pays for breakage
  • Waterproofing method and the cure time before tiling
  • Fan model and where it discharges
  • Site protection and waste removal
  • A program in working days, not "about a month"

Paying for it

In NSW the deposit on residential building work is capped at 10 per cent, and where the job value is above the threshold for home building compensation cover, that cover has to be in place before a deposit is even requested. Everything after the deposit should be tied to finished stages. If someone wants half up front or will not put the job in writing, that is your answer.

Renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request.

See what it costs for the guide tiers and step by step for the timing. Then call 02 4404 2684 or send the details through.

FAQs

Questions people ask before they commit

How do I know whether I need a full renovation or a tidy-up?

Water is the deciding factor. If the shower is not leaking, the floor is firm underfoot and the tiles are sound, a partial update will usually get you most of the way. Once water is in the frame or the floor, a cosmetic job just hides it.

How long is the bathroom out of action?

Roughly four to five and a half weeks on site for most main bathrooms. A brick veneer house on a slab sits at the shorter end. An old fibro cottage with asbestos to remove and floor timbers to replace sits at the longer end.

Can the shower or toilet be shifted?

On a timber floor with reasonable subfloor access, usually yes without much drama. On a slab it means cutting concrete and rerouting a waste, which adds cost. It is worth asking whether the shift genuinely improves the room first.

Can you tile straight over the old tiles?

It happens, and it is nearly always a mistake in an older wet area. You cannot inspect or replace the membrane underneath, the floor level creeps up at the doorway, and if the original bed lets go the new tiles come with it.